Thursday, May 4, 2023

All Drywall Installed! All Interior Piping Complete on Tiny Home

 

The drywall installation is basically complete, except for the shower area. We can't cover the wall up until we pressure test the copper water lines that we soldered. We began taping the joints of the drywall. I originally was not going to have the students do this, but thought that we have a little time and I wanted them to see the process of putting a wall together. I am still considering having the students place trim on all of the joints.

We also completed the electrical panel today, at least we are able to cover the wall. Today students placed wire connectors to the wires where they enter the panel. One mishap is that someone pulled one of the breakers incorrectly and broke a little corner of the plastic making the breaker not want to hold in its place.