This week we will stain wood trim, install wall plumbing valves, cabinets, cabinet tops, bench top, and flooring. Great day! We got a lot accomplished!
Completed surround in shower
Complteted wood trim in restroom, including stain
Completed stain around upstairs window
Completed carpet installation second floor
Completed wood trim around downstairs bench
Installed kitchen cabinets
Cut and placed kitchen, above front door, and sitting bench tops,
General clean up of construction area
Painted HVAC exterior stand
Installed hvac interior trim
Repaired exterior wall at entry
We had 7 chicks hatch the last two days
It felt good to be back after taking days off due to a bout with shingles
No comments:
Post a Comment