Today we did a hodgepodge of work. Continued work on the Copper water lines underneath the trailer and inside the kitchen and toilet compartment walls. We continued with drywall installation and drywall mudding. We also set up a ground wire from the electrical panel to the metal frame of the trailer that will eventually connect to the ground.
No comments:
Post a Comment