Today students worked on the ceiling, vent line, insulation, mobile portable storage container, green board drywall in the bathroom, and clean up of the construction area for their community service work.

Vent Line installation: The students installed a traditional home 1 1/2 inch vent line for the sewer system. The only thing we did differently was to use a mobile home/rv sewer vent line roof connector.
Also, in the top left picture, you can see where we relocated the upstairs light switch this week. We thought that if someone left the light on in the old location they would have to climb back up the ladder to turn off the lights. This way the switch can be reached from the lower level as well. 